Edit any input below — all financial outputs update instantly in real time.
How the number of waves affects supply consistency and costs
Each wave plants its share of blocks at the indicated week offset within the 56-week cycle. All waves replant 0.93× per year.
Changing the number of waves does not change total annual production or seedling count. The wave-dependent cost is Turnaround Labour: each additional wave beyond 2 adds a 5% coordination overhead to turnaround cost (scheduling, supervision, simultaneous block management). Bumblebee cost is a fixed rolling-replacement model — independent of wave count.
Year 1 at 70% ramp-up. Cumulative includes initial CapEx outlay of AED 132.90M.
Total annual operating cost: AED 17,944,122